2017 Road Resurfacing

The Village's annual Road Resurfacing Program is planned for the summer of 2017.  The following streets have been scheduled for repair this year.  The Village of Cary's investment in neighborhood infrastructure is approximately $1.0 million.    
Improvements to Georgetown Drive will also include reconfigured striping that will delineate the existing on-street parking and include a new designated bike route.

Start Date: Estimated Completion Date:
Concrete Work Began May 30
Paving Work Began June 5
Late Summer, 2017
 
Project Contact:
Joel Benton -  HR Green, Inc. (Resident Engineer for the Village of Cary)
Phone:  815-482-9794
Email:  jbenton@hrgreen.com

PROJECT UPDATES:


06/16/2017  Paving of first layer of asphalt completed on Georgetown and Cimarron.  Pavement removal on Forest Lane and High Road completed this week and paving of first asphalt layer began 6/16.
06/05/2017
Pavement removal on Cimarron Drive has begun.
06/01/2017 Today the contractor installed the remaining sidewalk on Georgetown and Cimarron.  They also installed the curb/sidewalk on Borden, Forest and High Street. Tomorrow they will install a gutter on Borden, the 4 squares of sidewalk on James Way and repairing a section of sidewalk on High Street.  They will also be stripping forms from areas where work is completed.
05/19/2017 Revised concrete schedule - sawcutting work to begin 5/25 with removals starting on 5/30 (weather permitting).
05/17/2017 Concrete work to remove and replace small sections of curb and sidewalk along the roadways included in this year's Road Program will begin on Monday, May 22 May 25 (weather permitting).  Signage will be installed later this week in advance of this work by the concrete sub-contractor.
The main asphalt work is still tentatively scheduled to begin in early June.
04/19/2017 Project tentatively anticipated to begin in early June 2017.
 

Sign up for TextCaster and select the Public Works message group to get the latest construction alerts sent directly to your mobile phone or email account.


2017 RESURFACING PROGRAM:


- GEORGETOWN DRIVE (THREE OAKS RD TO W. MAIN ST)
- CIMARRON DRIVE (GENEVA LN TO CONESTOGA TR) 
  
- HIGH ROAD (CHARLOTTE PL TO DEVERON CIR)
- BORDEN AVENUE (CRYSTAL ST TO PARK AVE)
- FOREST LANE (BRIGHT OAKS CIR TO OAK VALLEY DR)
- NEW HAVEN DRIVE, STRIPING ONLY (GEORGETOWN DR TO FORMER SAGE PKWY)

LOCATION MAP & STRIPING PLANS:

2017 ROAD PROGRAM
2017 road program striping 1
2017 road program striping 2